Minmax due-date assignment with a time window for acceptable lead-times
Year of publication: |
2013
|
---|---|
Authors: | Gerstl, Enrique ; Mosheiov, Gur |
Published in: |
Including special section: behavioral considerations in developing and applying operations research models. - New York, NY : Springer. - 2013, p. 167-177
|
Subject: | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Operations Research | Operations research | Heuristik | Heuristics | USA | United States | Algorithmus | Algorithm |
-
Scheduling flow shops with blocking using a discrete self-organising migrating algorithm
Davendra, Donald, (2013)
-
Ozturk, Onur, (2017)
-
The two-machine open-shop problem with unit-time operations and time delays to minimize the makespan
Munier-Kordon, Alix, (2010)
- More ...
-
A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines
Gerstl, Enrique, (2013)
-
A two-stage flexible flow shop problem with unit-execution-time jobs and batching
Gerstl, Enrique, (2014)
-
Due-window assignment with identical jobs on parallel uniform machines
Gerstl, Enrique, (2013)
- More ...