Mirror scheduling problems with early work and late work criteria
Year of publication: |
2021
|
---|---|
Authors: | Chen, Xin ; Kovalev, Sergey ; Sterna, Małgorzata ; Błażewicz, Jacek |
Published in: |
Journal of scheduling : JOS. - Dordrecht [u.a.] : Springer Science + Business Media, ISSN 1099-1425, ZDB-ID 2012329-2. - Vol. 24.2021, 5, p. 483-487
|
Subject: | Single machine | Parallel machines | Late work | Early work | Mirror problems | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control | Theorie | Theory |
-
Chen, Xin, (2020)
-
Single-machine scheduling with multi-agents to minimize total weighted late work
Li, Shi-Sheng, (2020)
-
Single machine scheduling with assignable due dates to minimize maximum and total late work
Justkowiak, Jan-Erik, (2023)
- More ...
-
Scheduling on parallel identical machines with late work criterion : offline and online cases
Chen, Xin, (2016)
-
Chen, Xin, (2020)
-
Two-machine flow shop scheduling with a common due date to maximize total early work
Chen, Xin, (2022)
- More ...