Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
Year of publication: |
2016
|
---|---|
Authors: | Kreter, Stefan ; Rieck, Julia ; Zimmermann, Jürgen |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 251.2016, 2 (1.6.), p. 387-403
|
Subject: | Resource-constrained project scheduling problem (RCPSP) | Calendars | Minimum and maximum time lags | Binary linear model formulations | Scatter search | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Projektmanagement | Project management | Mathematische Optimierung | Mathematical programming |
-
The total adjustment cost problem : applications, models, and solution algorithms
Kreter, Stefan, (2014)
-
Watermeyer, Kai, (2023)
-
Shan, Siqing, (2017)
- More ...
-
The total adjustment cost problem : applications, models, and solution algorithms
Kreter, Stefan, (2014)
-
Projektplanung : Modelle, Methoden, Management
Zimmermann, Jürgen, (2006)
-
Projektplanung : Modelle, Methoden, Management
Zimmermann, Jürgen, (2006)
- More ...