Multi-degree cyclic hoist scheduling with time window constraints
Year of publication: |
2011
|
---|---|
Authors: | Che, Ada ; Zhou, Zhen ; Chu, Chengbin ; Chen, Haoxun |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 49.2011, 19/21 (1/1.10/11.), p. 5679-5693
|
Subject: | Elektronisches Bauelement | Electronic component | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Roboter | Robot | Materialfluss | Material flow | Branch-and-Bound | Branch and Bound |
-
Feng, Jianguang, (2014)
-
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times
Jeong, BongJoo, (2014)
-
Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness
Mensendiek, Arne, (2015)
- More ...
-
Robust optimization for the cyclic hoist scheduling problem
Che, Ada, (2015)
-
Yu, Yugang, (2012)
-
Yu, Yugang, (2010)
- More ...