//-->
Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops
Zhang, Wei, (2005)
Storage space allocation in container terminals
Zhang, Chuqian, (2003)
Dynamic crane deployment in container storage yards
Zhang, Chuqian, (2002)