Bi-objective optimisation for scheduling the identical parallel batch-processing machines with arbitrary job sizes, unequal job release times and capacity limits
Year of publication: |
2015
|
---|---|
Authors: | Abedi, Mehdi ; Seidgar, Hany ; Fazlollagtabar, Hamed ; Bijani, Rohollah |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 53.2015, 6 (15.3.), p. 1680-1711
|
Subject: | scheduling parellel batch-processing machine (BPM) | release time | makespan | just-in-time scheduling | multi-objective evolutionary algorithm | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Evolutionärer Algorithmus | Evolutionary algorithm | Theorie | Theory | Just in Time | Just in time | Prozessmanagement | Business process management | Produktionssteuerung | Production control | Algorithmus | Algorithm |
-
Seidgar, Hany, (2015)
-
Shabtay, Dvir, (2012)
-
Matin, Hossein N. Z., (2017)
- More ...
-
Hybrid scheduling and maintenance problem using artificial neural network based meta-heuristics
Abedi, Mehdi, (2017)
-
Seidgar, Hany, (2014)
-
Seidgar, Hany, (2015)
- More ...