On three-machine flow shop scheduling with deteriorating jobs
Year of publication: |
2010
|
---|---|
Authors: | Wang, Ling ; Sun, Lin-yan ; Sun, Linhui ; Wang, Ji-bo |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 125.2010, 1, p. 185-189
|
Subject: | Produktionssystem | Manufacturing system | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Branch-and-Bound | Branch and Bound | Heuristik | Heuristics |
-
Rakrouki, Mohamed Ali, (2012)
-
Su, Ling-Huey, (2008)
-
Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times
Ladhari, T., (2012)
- More ...
-
A note on "On three-machine flow shop scheduling with deteriorating jobs"
Jafari, Abbas-Ali, (2017)
-
Flow shop makespan minimization scheduling with deteriorating jobs under dominating machines
Sun, Linhui, (2012)
-
On three-machine flow shop scheduling with deteriorating jobs
Wang, Ling, (2010)
- More ...