Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
Year of publication: |
2011
|
---|---|
Authors: | Li, Shisheng ; Ng, C.T. ; Cheng, T.C.E. ; Yuan, Jinjiang |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 2430034. - Vol. 210.2011, 3 (1.5.), p. 482-489
|
Saved in:
Saved in favorites
Similar items by person
-
Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
Li, Shisheng, (2011)
-
Group scheduling and due date assignment on a single machine
Li, Shisheng, (2011)
-
Scheduling deteriorating jobs with CON/SLK due date assignment on a single machine
Li, Shisheng, (2011)
- More ...