Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
We consider the problem of scheduling n deteriorating jobs with release dates on a single batching machine. Each job's processing time is an increasing simple linear function of its starting time. The machine can process up to b jobs simultaneously as a batch. The objective is to minimize the maximum completion time, i.e., makespan. For the unbounded model, i.e., b = [infinity], we obtain an O(n log n) dynamic programming algorithm. For the bounded model, i.e., b < n, we first show that the problem is binary NP-hard even if there are only two distinct release dates. Then we present O(nb) and O((nb/h)h) algorithms for the case where the job processing order is predetermined in advance and for the case where there are h, h [greater-or-equal, slanted] 2, distinct deteriorating rates, respectively. Furthermore, we provide a fully polynomial-time approximation scheme for the case where the number of distinct release dates is a constant.
Year of publication: |
2011
|
---|---|
Authors: | Li, Shisheng ; Ng, C.T. ; Cheng, T.C.E. ; Yuan, Jinjiang |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 210.2011, 3, p. 482-488
|
Publisher: |
Elsevier |
Keywords: | Scheduling Batching Deterioration Release dates Dynamic programming |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
Li, Shisheng, (2011)
-
Group scheduling and due date assignment on a single machine
Li, Shisheng, (2011)
-
Scheduling deteriorating jobs with CON/SLK due date assignment on a single machine
Li, Shisheng, (2011)
- More ...