//-->
Effect of rework, rejects and inspection on lot size with work-in-process inventory
Ullah, Misbah, (2014)
Setting optimal production lot sizes and planned lead times in a job shop
Yuan, Rong, (2016)
Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system
Kang, Chang Wook, (2017)
Performance evaluation of a multi-product system under CONWIP control
Satyam, Kumar, (2008)
Solving general multi-class closed queuing networks using parametric decomposition
Satyam, Kumar, (2013)
The Impact of Career Opportunities on Employee Retention in Hospitality Industry : A Comparative Study of Garhwal and Kumaun Region of Uttarakhand
Satyam, Kumar, (2021)