Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence
Year of publication: |
2014
|
---|---|
Authors: | Hwang, F. J. ; Kovalyov, Mikhail Y. ; Lin, B. M. T. |
Published in: |
Annals of operations research ; 217. - New York, NY : Springer. - 2014, p. 263-279
|
Subject: | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Produktionssteuerung | Production control | Heuristik | Heuristics | Durchlaufzeit | Lead time | Theorie | Theory | Algorithmus | Algorithm |
-
Mozdgir, A., (2013)
-
The optimal number of used machines in a two-stage flexible flowshop scheduling problem
Gerstl, Enrique, (2014)
-
An effective algorithm for flexible assembly job-shop scheduling with tight job constraints
Lin, Wenhui, (2022)
- More ...
-
Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence
Hwang, F. J., (2012)
-
Hwang, F. J., (2018)
-
Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence
Lin, Bertrand M. T., (2017)
- More ...