Solving multi-objective rescheduling problems in dynamic permutation flow shop environments with disruptions
Year of publication: |
1-15 October 2018
|
---|---|
Authors: | Valledor, Pablo ; Gómez, Alberto ; Priore, Paolo ; Puente, Javier |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 56.2018, 19 (1/15.10.), p. 6363-6377
|
Subject: | dispatching rules | multi-objective | rescheduling | predictive-reactive | machine breakdowns | stochastic processing times | arrival of new jobs | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Theorie | Theory | Produktionssteuerung | Production control | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis |
-
Kim, Young-In, (2021)
-
A holonic approach to flexible flow shop scheduling under stochastic processing times
Wang, Kai, (2014)
-
Stochastic single machine scheduling problem as a multi-stage dynamic random decision process
Roohnavazfar, Mina, (2021)
- More ...
-
Medical doctor rostering problem in a hospital emergency department by means of genetic algorithms
Puente, Javier, (2009)
-
Medical doctor rostering problem in a hospital emergency department by means of genetic algorithms
Puente, Javier, (2009)
-
A decision support system for applying failure mode and effects analysis
Puente, Javier, (2002)
- More ...