The performance of priority dispatching rules in a complex job shop : a study on the Upper Mississippi River
Year of publication: |
2019
|
---|---|
Authors: | Sweeney, Kevin D. ; Sweeney, Donald ; Campbell, James F. |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 216.2019, p. 154-172
|
Subject: | Complex dynamic job shop | Priority dispatching rules | Scheduling | Real-world application | Discrete event simulation | Scheduling-Verfahren | Scheduling problem | Simulation | Theorie | Theory | Produktionssteuerung | Production control |
-
Strohhecker, Jürgen, (2016)
-
Shady, Salama, (2023)
-
Fu, Yaping, (2025)
- More ...
-
Teaching supply chain and logistics management through commercial software
Sweeney, Donald, (2010)
-
A continuous approximation approach to integrated truck and drone delivery systems
Zhang, Juan, (2024)
-
Integrated multi-period dynamic inventory classification and control
Yang, Liu, (2017)
- More ...