Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Year of publication: |
2009
|
---|---|
Authors: | Moslehi, G. ; Mirzaee, M. ; Vasei, M. ; Modarres, Mohammad ; Azaron, Amir |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 122.2009, 2, p. 763-773
|
Subject: | Produktionsplanung | Production planning | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem | Branch-and-Bound | Branch and Bound | Algorithmus | Algorithm |
-
A two-stage three-machine assembly scheduling problem with a position-based learning effect
Wu, Chin-Chia, (2018)
-
A two-stage three-machine assembly scheduling problem with deterioration effect
Wu, Chin-Chia, (2019)
-
Kazemi, Hamed, (2023)
- More ...
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
- More ...