Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Year of publication: |
2009
|
---|---|
Authors: | Moslehi, G. ; Mirzaee, M. ; Vasei, M. ; Modarres, M. ; Azaron, A. |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 10925260. - Vol. 122.2009, 2, p. 763-773
|
Saved in:
Saved in favorites
Similar items by person
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
- More ...