Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times
This paper addresses the job shop scheduling problem to minimize the number of tardy jobs, considering the sequence dependent setup time. This problem is taken as a sequencing problem, and a family of approaches with different levels of intricacy is proposed. The simplest form is a critical ratio-based dispatching rule, which leads to satisfactory solutions by taking into account the group information rather than only the individual information of jobs. Then, an enhanced approach consisting of an iterative schedule refining mechanism will be given. Its feature is to iteratively adjust the estimation of the remaining processing times of jobs in a dynamic and operation-specific manner. Finally, a genetic algorithm which takes the dispatching rule and the refining mechanism as the core is proposed. The performance of these approaches is carefully examined by a comprehensive experimental study.
Year of publication: |
2009
|
---|---|
Authors: | Chiang, Tsung-Che ; Fu, Li-Chen |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 196.2009, 1, p. 78-92
|
Publisher: |
Elsevier |
Keywords: | Scheduling Job shop Sequence dependent setup Dispatching rules Genetic algorithms |
Saved in:
Saved in favorites
Similar items by person
-
Chiang, Tsung-Che, (2009)
-
Chiang, Tsung-che, (2010)
-
Rule-based scheduling in wafer fabrication with due date-based objectives
Chiang, Tsung-che, (2012)
- More ...