//-->
Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times
Chiang, Tsung-Che, (2009)
A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival
Chiang, Tsung-che, (2010)
Rule-based scheduling in wafer fabrication with due date-based objectives
Chiang, Tsung-che, (2012)