//-->
Effect of rework, rejects and inspection on lot size with work-in-process inventory
Ullah, Misbah, (2014)
Setting optimal production lot sizes and planned lead times in a job shop
Yuan, Rong, (2016)
Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system
Kang, Chang Wook, (2017)
Valid inequalities for the single-item capacitated lot sizing problem with step-wise costs
Akbalik, Ayse, (2007)
Valid inequalities and separation for capacitated economic lot sizing
Pochet, Yves, (1986)
AKBALIK, Ayse, (2007)