Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems
| Year of publication: |
2014
|
|---|---|
| Authors: | Keshavarz, Taha ; Salmasi, Nasser |
| Published in: |
European Journal of Industrial Engineering. - Inderscience Enterprises Ltd, ISSN 1751-5254. - Vol. 8.2014, 3, p. 366-387
|
| Publisher: |
Inderscience Enterprises Ltd |
| Subject: | flowshop scheduling | group scheduling | sequence-dependent setup times | branch and price | lower bound | metaheuristics | upper bound | hybrid genetic algorithms |
-
Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems
Keshavarz, Taha, (2014)
-
Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times
Hendizadeh, S. Hamed, (2007)
-
Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times
Hendizadeh, S. Hamed, (2007)
- More ...
-
Flowshop sequence-denpendent group scheduling with minimisation of weighted earliness and tardiness
Keshavarz, Taha, (2019)
-
Keshavarz, Taha, (2015)
-
Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems
Keshavarz, Taha, (2014)
- More ...