Joint optimization of flexible job shop scheduling and preventive maintenance under high-frequency production switching
Yu Wang, Tangbin Xia, Yuhui Xu, Yutong Ding, Meimei Zheng, Ershun Pan, Lifeng Xi
Year of publication: |
2024
|
---|---|
Authors: | Wang, Yu ; Xia, Tangbin ; Xu, Yuhui ; Ding, Yutong ; Zheng, Meimei ; Pan, Ershun ; Xi, Lifeng |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier Science, ISSN 1873-7579, ZDB-ID 2020829-7. - Vol. 269.2024, Art.-No. 109163, p. 1-22
|
Subject: | Flexible job shop scheduling | Preventive maintenance | High-frequency production switching | Variable operating conditions | Hybrid meta-heuristics algorithm | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Produktionssteuerung | Production control | Theorie | Theory | Algorithmus | Algorithm | Heuristik | Heuristics | Flexibles Fertigungssystem | Flexible manufacturing system |
Saved in: