//-->
A branch and bound algorithm for scheduling unit size jobs on parallel batching machines to minimize makespan
Ozturk, Onur, (2017)
Two-machine flow shop scheduling with deteriorating jobs : minimizing the weighted sum of makespan and total completion time
Cheng, Mingbao, (2015)
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times
Jeong, BongJoo, (2014)
Parallel machine scheduling with preference of machines
Chuang, Ming-Chou, (2010)
Minimizing the sum of job completion times on capacitated two-parallel machines
Liao, Ching-Jong, (2009)
Scheduling with multi-attribute setup times
Lee, Cheng-Hsiung, (2012)